Picture 11
Here you can see where over the first shallow wall footings and the additional L shaped deep perimeter trench, a raft of concrete has been laid with steel protruding from the deep trench and tied into steel work covering the slab ready for a pour of more concrete to tie the existing footings into the anti-subsidence deep footing. The new deep trench looks to be down to just below river bed level. This emergency work only appears to have been done on the north east corner of the 4 house plot so far.